The Hot Rod Garage was open for business today.
I need to solder a pinion gear. Then the motor can be glued in place and wired.
It took a lot of extra sanding to get the chassis to fit the back of the body. I had to install the bearings on the inside because the flanges were in the way.
I hope to have it running later today sometime. Very little room for the rear body post so it had to be drilled offset. Everything is a super tight fit at the back of the car. But it all fits.
Ken